Concrete work in East & West Sussex.
Slabs, bases and structural concrete laid level, strong and built to last.
- Floor slabs and bases
- Driveways and hardstanding
- Foundations and structural concrete
- Residential and commercial projects

Concrete
Concrete done properly
Good concrete work depends on preparation. The sub-base, reinforcement, mix and curing all affect how well a slab performs. We prepare each job carefully so your concrete doesn’t crack, sink or crumble.
Our concrete services
What makes the difference
















FAQs
Concrete FAQs
How long before I can use a new concrete slab?
Foot traffic is usually fine after a day or two. Vehicles should wait at least seven days, and full strength is reached after around 28 days.
Do you lay concrete bases for garden rooms?
Yes. We lay level, reinforced bases for garden rooms, sheds and outbuildings.
How a job runs
Four steps, no surprises
We call you back
To talk through the job and book a free site visit at a time that suits you.
Free site visit
We measure up, listen to what you want and flag anything that will affect cost or timing.
Written estimate
A clear breakdown of labour, materials and programme, with no vague provisional sums.
The build and sign-off
An agreed start date, regular updates, a tidy site and a walk-round together at the end.
Related services